The railroad bridge between Beverly and Salem reopened to trains at 2:30 p.m. today, according to the MBTA.
The bridge had closed at 7 a.m. when a gear box failed, preventing the bridge operator from locking the bridge back into place after it had opened to allow a boat to pass through. It's the third time in the last month that the bridge was forced to close.
Comments from users with registered accounts will post at once. Comments from unregistered accounts will post after being reviewed by a site moderator. Posts that do not meet site standards, which can be found here, will be removed.